Tuesday, 9 February 2010

Samba poster



This is my poster which i made on the samba history and origins, i choose relevant images to represent brazil, where it became popular.

Friday, 5 February 2010

risk assessment

It is important to do risk assessments for outdoor performance because of the  risks involved for example there is getting hit by cars and busses and things like that then weather and the surroundings. 

Changing the performance day didn't have much impact as it was raining yesterday and we would have all got wet, its important that we have our risk assessment for health and safety issues so it is a good thing that we waited. Hopefully next week everything will all be done and also the weather will hopefully be better. 

Dress rehearsal



Yesterdays dress rehearsal went quite well other than it was very sameish but the band as a whole did sound really good and together and very in tune. we also practiced in our costumes and masks.
In the costumes it did feel a bit different however i don't feel that comfortable wearing the masks as i feel we look a little silly. The t-shirts aren't that bad only the fact that they haven't been painted that well. They could look successful if everyone wears them but i don't think no one will actually wear the masks. 
If we had more time then i would definitely have made the t-shirts a lot better and also would have maybe thought more about the masks as i think they are a bit too out there.
But on a whole i think there has been a lot of hard work put into the the whole costume and banners and everything.

Wednesday, 3 February 2010

update on cramba

today i have helped complete the masks and also arranged the tops into piles of who has what with what mask, i also completed my poster on samba. We also had to re arrange tomorrow as our performance was cancelled due to health and safety issues so tomorrow instead of doing our performance we are going to the junction to do another rehearsal but its a dress rehearsal with all our masks and t-shirts.

Back to TOP